1/35 M74 Tank Retriever

First fit of the tow bar and the crane mast.  Brass rod was used to install 30 steps on the mast, drilling holes where some raised bosses were molded.  The major parts are just test fit at this point.

M74 Tank Retriever Index Page  ______  Armor Index Page  ______   My Models Index Page  _____  John Eaton Home Page