Jigging up the wing
on the leading edge. Use the drawing on the plan of the wing front
view to
align
the base
of the
clamps, the red centerline and tip detail is repeated out at the right
tip for reference.
This is the firm that
sells these triangles, they are also made in 12 inch sizes.
http://www.swansontoolco.com/product/speedlite-square-orange/
The bases are
drilled so T-pins can hold them in place.
Gluing in the center
section doublers which are internal to the spar caps.
Next the spar
center section caps will be installed. Use 30 minute epoxy for all
center section assembly so you can get precise alignment.
All
the nose blocks have been installed and sanded. For the landing
gear installation, using a dremel tool the appropriate areas were routed
out. Cutting
in to the lower longeron for the
rear leg is OK because the inner ply doubler reinforces the area.
The removed section of center stringer will be replaced later.